|
Black Lake Pipe Line Company is a 306 mile common carrier NGL
pipeline system that is FERC regulated, originates at the Cotton Valley
station in Northwestern Louisiana and terminates at Mont Belvieu, Texas.
The system consists of a 254 mile trunkline and the 52 mile idled Rosepine
lateral that originates at the Master Creek Station in Louisiana and
terminates at the Wiergate Station in Texas. The System connects
customers through 6 stations in Eastern Texas and Western Louisiana
to Mont Belvieu, Texas. The system has a capacity of 43,000 bpd. The
system is composed of 65 miles of 6” pipeline and 189 miles of 8” pipeline.
Receipt points in Louisiana include: Cotton Valley, Minden, and Black Lake.
Receipt points in Texas include: Wiergate/Jasper, and Raywood.
Delivery point in Texas: Mont Belvieu
|